The Old Control Tower (Heathrow Airport)

Contractor: Mace Limited
Client: BAA
Value: £400,000

A long-term rebuilding and facilities enhancement programme is well underway by BAA at Heathrow Airport. The next new passenger terminal, Heathrow East, is due to be built on the site currently occupied by Terminal 2 and the separate Queens Building. However, in preparation for demolition a new home was required for offices in the Queens Building. So our fit out team at Heathrow was called in to convert and upgrade much of the substantial, disused office space available in the airport’s 7-storey Old Control Tower, itself superceded two years ago with the opening of Heathrow’s new control tower. Following our comprehensive fit out programme, the Old Control Tower has been brought back into use as office space and the offices in the Queens Building can now be transferred over.

Project photo
Telehouse West Technology Centre Oakhill House Heathrow Airport Limited Connections and Baggage
 
© Copyright Lucas Fit Out Ltd 2010   |   Site map   |   Privacy Policy   |   Terms & Conditions   |   Feedback   |   LucasUK.com   |   S.Lucas Group Portal Page